Posted by Ginny Davis on 10/08/2014

We're taking advantage of the great fall weather to continue working on the infrastructure around the new building. Currently we're working on the third (and final) rock wall that will unite our multi-level pathways around the south end of the park. Excavation has been tricky on the Maine's rocky terrain but we've got a masterful crew doing an awesome job!

Here's some great shots of the exterior changes to the old Goodies Cafe building - we didn't keep much. Just 2 walls of the first floor plus the basement. We've added a second floor with a cathedral ceiling and a loft plus extended 2 of the old exterior first floor walls.

The added space will be used to relocate foodservice upstairs -with more seating and restrooms, while maintaining ticketing for snow tubing downstairs.